Soil Testing and Compaction Certification After Pool Fill-In

Hunter Pool Removals is an independent referral service and does not perform or contract for the advertised work. Your enquiry may be referred to an independent contractor. Where licensing is required, the contractor's identity and licence details will be provided before you accept a quotation or enter a contract.

A compaction certificate is a testing laboratory’s report showing that the fill placed in a former pool excavation reached a specified density, measured at set points and depths as the fill went in. It matters most if anything with footings may be built over the area, because the certifier or engineer for that work will want evidence of what is in the ground; for lawn or garden only, layered compaction and the fill dockets are usually what an owner keeps. The density target is set by the engineer or certifier for the intended use, and testing is done layer by layer during the backfill, so it needs to be arranged before the work starts.

Why Compaction Matters After Pool Fill-In

The NSW Demolition Code requires the site of a removed pool to be restored to the adjoining ground level with compacted fill. Fill tipped into a hole in one go holds more air and settles over time, which shows up as a dip in the lawn, cracked paving or a structure moving on one side. Fill placed in layers, each compacted before the next goes on, settles far less; the excavation and backfill page explains the method. Testing is how that compaction is proved rather than assumed.

What Does Compaction Testing Involve?

Laboratories test fill using the Australian Standard methods in the AS 1289 series, Methods of testing soils for engineering purposes. The ones most relevant to pool fill:

TestWhat it doesStandard
Nuclear density gaugeMeasures field density and moisture of the fill in placeAS 1289.5.8.1 (nuclear surface moisture-density gauge, direct transmission mode)
Sand replacementDigs a small hole and measures its volume with sand to find field densityAS 1289.5.3.1 (sand-cone pouring apparatus)
Dynamic cone penetrometerDrives a cone with a dropped weight to show resistance through the depthAS 1289.6.3.2 (9 kg dynamic cone penetrometer)
Laboratory referenceFinds the density the same material reaches under standard compactive effortAS 1289.5.1.1

Field results are compared with the laboratory reference as a dry density ratio, the method in AS 1289.5.4.1 (compaction control test). Because a pool fill is deep, it is tested in layers as it is placed, not just at the surface.

What Compaction Standard Is Required?

There is no single NSW figure for pool fill. None of the five Hunter councils publishes a fill standard for a removed pool, so the target is whatever the engineer or certifier specifies for the intended use, usually as a percentage of the laboratory reference density. Engineers and certifiers often reference AS 3798-2007, the earthworks guideline; it is a guideline, not a law, and Standards Australia lists it as pending revision. If you may build a slab, garage or granny flat over the area, get the target from that project’s engineer or certifier before backfilling starts.

What the Compaction Certificate Itself States

A laboratory report on fill compaction typically sets out:

  • the target the fill was tested against and the reference method;
  • the test method used at each point;
  • where and at what depth each test was taken;
  • a pass or fail for each point, with any failed zone reworked and retested;
  • the date and the laboratory’s details, including its accreditation. NATA accredits organisations that perform testing and publishes a search of accredited organisations.

What it does not do is assess the natural ground under the fill or design footings. That is a geotechnical engineer’s job.

What Fill Material Is Used?

What goes in the hole matters as much as how it is compacted.

MaterialStatusSource
Certified clean fill or certified ENM (excavated natural material)The only material Kiama Council’s explanation of the state rule allowsKiama Council fact sheet
Building or demolition waste, including the broken pool shell or copingNot allowed as fill, per the same sheetSame
Topsoil over the topFinishing layer for turf or beds, not structural fillAS 4419-2018, Soils for landscaping and garden use

The VENM and ENM guide explains the fill classes, and the same Kiama sheet says to keep the delivery receipts for the certified fill.

When Is a Compaction Certificate Required?

No Hunter council publishes a rule requiring one for every pool removal. It is worth having, or will be asked for, when:

  1. You plan to build over the filled area. The engineer or certifier for the new structure decides what evidence they need.
  2. The approval asks for it. Read the CDC conditions or DA consent before work starts.
  3. You may sell. Test results, fill dockets and the approval are the records a buyer’s adviser can check.

For lawn or garden only, testing is optional; layered compaction and the dockets are the minimum to keep.

How Long Does Testing Take?

The tests themselves are done on site as each layer goes in, so testing adds visits during the backfill rather than a delay at the end. No published source gives a standard turnaround for the report; ask the laboratory before the job is booked.

Cost of Compaction Testing and Certification

No published source this site could verify gives a Hunter or NSW price for compaction testing or a compaction certificate after a pool fill, so ask for written fees. The cost depends on the number of test points and layers, site visits, and whether an engineer’s report is also needed. The contractor may arrange testing as a line item in the removal quote; otherwise the owner engages the laboratory. The pool removal cost guide covers the removal prices around it.

The Relationship Between Compaction Certification and Geotechnical Reports

A compaction report confirms that fill already placed met its target. A geotechnical report is an engineer’s wider advice on the fill and the ground beneath it for a particular structure, drawing on AS 2870-2011 for house slabs and footings (Standards Australia). Building over the area usually needs both; the geotechnical report guide and the building over a filled-in pool guide cover that side.

What Happens If Fill Doesn’t Pass?

A failed point means that layer is reworked before more fill goes on: compacted again, dried out or wetted to the right moisture, or dug out and replaced, then retested. Common causes are layers placed too thick, fill too wet or too dry, and unsuitable material in the load. Wet weather can stop the work, because saturated fill will not compact properly.

Frequently asked questions

Is a compaction certificate the same as a geotechnical report?

No. A compaction report shows the fill reached its specified density; a geotechnical report is an engineer’s advice on footings for a particular structure. Building over the area usually needs both.

My contractor says they don’t need to do compaction testing. Is this OK?

For lawn or garden only, testing is often optional. If anything with footings may be built there, ask the engineer or certifier what they need before backfilling starts, and get it written into the quote.

How many test points are needed for a pool fill-in?

There is no fixed number. The engineer or laboratory sets the testing plan from the depth and area of fill and the target; ask for it in writing.

How long do I need to wait after fill placement before testing?

Usually no separate wait: each layer is normally tested once it has been compacted and before the next layer goes on, so testing runs alongside the backfill. The laboratory or engineer sets the timing for the fill being used; ask for it in writing.

Can I get a compaction certificate for a partial pool fill-in?

The fill can be tested the same way, but the buried shell was not designed to carry a footing, and on Kiama Council’s explanation of the state rule a partial removal needs a DA. If you may build there, ask an engineer before choosing the partial fill-in method.

Request a quote and ask for the fill type, layer method and any density testing to be listed in the price.

Sources

Last reviewed 16/11/2026. How these pages are researched and corrected.

More guides

Removing Solar Pool Heating Systems in Newcastle & Lake Macquarie

What happens to rooftop solar pool heating when you remove a pool in Newcastle and Lake Macquarie: who disconnects…

View

Hot Tub Removal & Disposal: Cost, Crane Lift and Recycling

Hot tub removal and disposal: lifting a portable spa out whole, when a crane is needed, what can be recycled, what…

View

Removing a Steel-Frame Above-Ground Pool in the Hunter

Removing a steel-frame above-ground pool: when DIY is realistic, when to hire, lawful draining in the Hunter, the…

View

More on this topic

Request a quote

Tell us about the job and an independent local contractor can quote it.

Get a Quote