For a lap pool or a pool with a deep end, depth matters more than length or surface area. A deeper hole means more concrete to break and cart, more fill to bring in, and more compacted layers to build back up to ground level. A long, narrow lap pool at a constant depth can therefore need more work than a wider family pool that slopes from a shallow end.
The usual answer for these pools is a full pool removal, with the fill placed and compacted in layers. What that costs depends on the volumes, access and disposal, which the contractor measures at inspection.
Depth Drives the Volumes
The hole to be filled is roughly length × width × average depth. As an illustration only (simple arithmetic, not a real pool or a quote), a pool 10 m long and 3 m wide holds:
| Average depth | Approximate hole volume |
|---|---|
| 1.2 m | 36 m³ |
| 1.5 m | 45 m³ |
| 2.0 m | 60 m³ |
Same length, same width, two-thirds more hole at 2 m than at 1.2 m. The shell’s wall and floor area also grows with depth, so there is more concrete to break. Real pools have sloping floors, steps and rounded corners, and compacted fill takes more material than the loose volume suggests, so the contractor’s measurement is what counts. The fill volume guide explains how fill is estimated.
Diving Wells and Deep Ends
A diving well concentrates depth in one corner: a deep, confined section the machine has to reach down into, often with thick walls and floor. It is usually among the last parts broken. The diving pool removal guide covers these pools in more detail.
Benches, seats and steps are smaller and come out with the walls.
Long Pools and Joints
Long pools may have been built with joints in the shell. Where they exist, they can give the breaker a natural starting line; whether your pool has them is something the contractor can check on site. Either way, the method is the same hydraulic breaker used on any concrete pool.
Filling and Compacting a Deep Hole
Under the NSW Demolition Code, where demolition removes a pool, piping must be removed and the site restored to the adjoining ground level with compacted fill. In a deep hole, that means many layers, each compacted before the next goes on. Skipping or rushing layers is how soft spots and later settlement happen.
What goes in matters too. A Kiama Council fact sheet explaining the state rules says only certified clean fill or certified excavated natural material may be used, well compacted, with no demolition waste. None of the five Hunter councils publishes its own fill standard for a removed pool.
For testing, engineers and certifiers often reference AS 3798-2007, an earthworks guideline rather than a law. On a deep pool, and especially if anything will be built or paved over it, ask before work starts:
- what fill will be used, with delivery dockets
- the layer thickness and compaction equipment
- whether compaction will be tested through the depth or only at the surface, and by whom
- whether you will get written results at handover
The excavation and backfill page covers the fill stage.
Partial Fill-In or Full Removal
A partial fill-in breaks the upper walls, opens the floor and fills over what is left. The Kiama sheet says partial removal could not be done as complying development and would need a development application, and that council may note the buried structure on the title. On a deep pool, more of the old shell stays buried. If you may build or pave over the area later, full removal is the cleaner base; ask an engineer if unsure.
Keeping It as a Pond
Some owners consider turning an unused lap pool into a pond. While it can still hold more than 30 cm of water, the Swimming Pools Act barrier rules still apply, so check with council before changing the fence.
Price Drivers
The pool removal cost guide has the published ranges for concrete pool removal, with publisher and date; none separates lap pools or diving wells. Depth and length (concrete and fill volume), access along the pool, full or partial removal, any diving well, and where the rubble is tipped move the number.
Lap Pool Removal FAQs
Why can a lap pool cost more than a bigger family pool?
Volume, not surface area, drives the work. A long pool at constant depth can hold more concrete and need more fill than a wider pool that is shallow at one end.
Can a lap pool be partially filled in?
It can, but more of the shell stays buried, and on Kiama Council’s explanation of the state rule a partial removal would need a development application rather than a complying development certificate. Talk to an engineer if you plan to build over it.
Do diving wells cost more to remove?
They usually take more machine time and fill, because they are deep and confined. No published guide prices them separately.
What fill goes into a deep pool?
Certified clean fill or certified excavated natural material, compacted in layers, according to the Kiama Council sheet on the state rules. Ask for the dockets and compaction records.
To get your lap or deep-end pool measured and priced, request a quote.
Sources
- NSW Planning: Demolition of buildings (pool piping and compacted fill; updated 23 March 2026), checked 15/11/2026
- Kiama Council: Removal of a swimming pool fact sheet (PDF, 1 September 2021) (a non-Hunter council’s explanation of the state rules), checked 15/11/2026
- Standards Australia: AS 3798-2007 (earthworks guideline), checked 15/11/2026
- NSW Government: Owning a pool or spa, your obligations (30 cm rule; updated 16 March 2026), checked 15/11/2026