The pool shell of an infinity-edge (vanishing-edge) or raised pool is broken out like any other concrete pool. The extra work is what surrounds it: a catch basin and balance tank behind the lowered edge, more plumbing, and on a sloping block, walls that may be holding back soil, a terrace or a deck. The key question before demolition is which walls are doing structural work, and what will replace them once they are gone.
That question is answered on site, often with an engineer, not from photos. This page sets out what to look for and which approval rules touch the walls as well as the pool.
What Is Different About These Pools
- The vanishing edge and catch basin. The lowered wall spills into a catch basin or trough, itself a small concrete structure tied to the main shell, which has to come out as well.
- Balance tank and extra plumbing. Infinity systems usually have a balance tank and extra pipework back to the pump. Removal includes all associated plumbing, pipework and cabling, as a Kiama Council fact sheet on the state rules puts it (Kiama Council; none of the five Hunter councils publishes an equivalent).
- Walls that retain. On a slope, the downhill wall of the pool, or a wall beside it, may be holding up the ground or a structure behind it.
- Raised bases. A pool built above natural ground can sit on an engineered base, sometimes over a void or a room.
When a Wall Is Holding Up the Slope
If a pool wall is genuinely retaining soil or a structure, breaking it out removes that support. Something has to take its place: a new retaining wall, or a re-graded slope that no longer needs one. That is engineering design, and it should be settled before demolition, not after.
The fill rule matters here too. Under the NSW Demolition Code, where demolition removes a pool, the site must be restored to the adjoining ground level with compacted fill. The Kiama fact sheet adds “considering any sloping of the site”. On a raised pool, what “adjoining ground level” means for your block is a question for the certifier or council at the approval stage. The backfill service page covers fill and compaction.
Approvals for the Walls, Not Just the Pool
Most pool removals need a complying development certificate (CDC) or a development application (DA). Walls and decks attached to the pool are a separate question:
- The Kiama fact sheet says removing ancillary structures such as decking or retaining walls may need prior development approval, unless they were built as exempt development.
- City of Newcastle says some new retaining walls can be exempt development if they meet the state development standards; otherwise consent is needed before installation. Other councils apply the same state code.
- In a mine subsidence district, Subsidence Advisory NSW’s exempt development list includes demolition, and retaining walls up to 1 m, under all guidelines. A replacement wall taller than that is not on the list, so ask Subsidence Advisory NSW whether it needs approval. Its district maps cover parts of Newcastle, Lake Macquarie, Maitland and Cessnock.
Ask the certifier to look at the pool, the walls and any replacement wall as one scope. The retaining wall and landscaping guide covers what often follows.
Full Removal or Partial Fill-In
A partial fill-in leaves part of the shell in the ground. The Kiama sheet says partial removal could not be done as complying development and would need a DA, and that council may note the buried structure on the title. On a sloping site, a buried wall that was retaining soil is also left unmonitored. Whichever route, if a pool wall has a structural role, ask for an engineer’s view before choosing. The sloping block guide covers machine access and fill on slopes.
What the Quote Should Cover
- a structural or geotechnical check of any wall that may be retaining
- the demolition sequence, staged to protect what is uphill or beside the pool
- removal of the catch basin, balance tank and all pipework
- what replaces any retaining function, and who designs and approves it
- fill type, compaction method and drainage on the slope
- draining, licensed electrical disconnection, an asbestos check for older surrounds, and who asks council to update the Swimming Pool Register
Price Drivers
No published guide prices infinity-edge or raised pool removal separately. The drivers are the concrete volume, the catch basin and plumbing, access on the slope, any engineering, and any replacement wall. The pool removal cost guide has published ranges for concrete pools; a replacement retaining wall is priced separately by the contractor and engineer. The concrete pool removal page covers breaking and disposal.
Infinity-Edge Pool Removal FAQs
Why can these jobs cost more than a standard concrete pool?
The catch basin, balance tank, extra plumbing, harder access on a slope and any engineering or replacement wall all add scope that a flat-block pool does not have.
Does every raised pool need an engineer?
Not always. Any wall that appears to hold back soil, a terrace or a structure should be assessed before demolition; the inspection decides.
Can a retaining wall stay while the pool goes?
Sometimes, if an engineer confirms it works independently of the pool shell. Removing an attached retaining wall may itself need approval unless it was built as exempt development.
Does mine subsidence affect a new retaining wall?
Subsidence Advisory NSW lists retaining walls up to 1 m as exempt under all guidelines. For anything taller in a district, ask Subsidence Advisory NSW.
For an assessment, request a quote with photos of the pool, the edge and the slope below it.
Sources
- NSW Planning: Demolition of buildings (pool piping and compacted fill; updated 23 March 2026), checked 15/11/2026
- Kiama Council: Removal of a swimming pool fact sheet (PDF, 1 September 2021) (a non-Hunter council’s explanation of the state rules), checked 15/11/2026
- City of Newcastle: Retaining wall, checked 15/11/2026
- Subsidence Advisory NSW: Exempt Developments List (PDF, April 2023), checked 15/11/2026
- Subsidence Advisory NSW: Mine Subsidence Districts (modified 25/09/2025), checked 15/11/2026