On a sloping block, the pool shell often doubles as a retaining wall: it holds back the ground on the high side, and sometimes sits on built-up ground on the low side. Taking it out removes that support, so the job needs a plan for holding the slope during the dig, filling the hole without the fill creeping downhill, and a permanent wall or batter afterwards. Machine access and wet-weather erosion are the other two things that change on a slope, and both are reasons for a site inspection before any price.
What Changes on a Slope
- The high side. Where the pool was cut into the hill, the shell wall holds up the soil above it. Once it is broken out, that face needs to be battered (cut back to a stable angle) or supported until the fill and any new wall are in.
- The low side. Where the pool sits on a built-up terrace, there may be an existing wall below it. Breaking the shell and placing fill changes the load on that wall.
- Machine access. SafeWork NSW lists working on a hill or the side of an excavation among the rollover risks for earthmoving plant, so the contractor may need a smaller machine, a different standing position or more hand work.
- Water. Rain runs downhill through the work area, carrying loose soil with it.
Holding the Ground During the Dig
SafeWork NSW treats a trench or shaft with an excavated depth greater than 1.5 m as high risk construction work, which needs a site-specific safe work method statement before work starts, and lists shoring, benching and battering as ways to control collapse (SafeWork NSW, Excavations and earthmoving plant). Whether a given pool dig falls within that is for the contractor to work through, but on a slope it is worth asking how the high-side face will be held while the shell comes out.
If the shell also supports a neighbour’s ground, or the high side is close to the boundary, see the boundary fence guide and ask whether an engineer should look first.
Filling on a Slope
Fill on a slope wants to move downhill as it is placed. The usual answers are to contain the low side before the upper layers go in, place and compact thin layers one at a time, and use certified clean fill or ENM that compacts well. Under the NSW Demolition Code, where demolition removes a swimming pool, the site must be restored to the adjoining ground level with compacted fill. If anything may be built over the area later, plan testing layer by layer; many engineers and certifiers reference AS 3798-2007, an earthworks guideline (not a law) listed as pending revision. The excavation and backfill page covers compaction.
Retaining Walls Afterwards
A sloping-block removal may end with a new wall or a regraded batter. On approvals:
- NSW Planning’s earthworks and retaining walls page lists exempt requirements, including that works must not redirect surface water or groundwater or send sediment onto an adjoining property, must be at least 2 m from any other retaining wall on the site, and must be structurally adequate and comply with the Building Code of Australia. A certifier can confirm whether a planned wall is exempt or needs a CDC or DA.
- In a mine subsidence district, Subsidence Advisory NSW’s exempt list covers retaining walls up to 1 m and demolition under all guidelines; a taller wall needs its approval. Parts of Newcastle, Lake Macquarie, Maitland and Cessnock are in mapped districts.
The pool removal plus retaining wall guide covers the order of work when a wall and landscaping follow.
Erosion and Wet Weather
A demolition CDC requires erosion and run-off controls (NSW Planning), and on a slope they go below every disturbed area: sediment fencing along the contour, covered stockpiles, and cover on bare fill until it is turfed or planted. The Bureau of Meteorology’s Newcastle Nobbys station (061055) has its wettest months from March to June, each averaging about 116 to 119 mm, so allow for weather in the schedule. The erosion and sediment control guide has the details.
Cost
No published source prices slope work separately. Slope adds cost through a smaller machine and more hours, support or battering of the high side, extra sediment controls, and any new retaining wall, which is usually a separate scope. The cost guide has the published whole-job ranges, and the full pool removal page covers the scope.
Questions to Ask the Contractor
- Where will the machine stand, and what size is it?
- How will the high-side face be held while the shell comes out?
- Is a retaining wall in the scope, or a separate job, and who designs it?
- What erosion controls go in, and who maintains them?
- Is compaction testing included?
- What happens to the price and schedule if rock or groundwater turns up?
Request a quote with photos taken from the top and bottom of the slope and of the access route.
FAQs
Does a sloping block always need a retaining wall after pool removal?
Not always. A gentle slope may be regraded into a stable batter, but where the pool was cut into the hill, some form of retaining is common. The contractor or an engineer can say which suits the site.
Do I need approval for the new retaining wall?
It depends on the wall. NSW Planning lists exempt requirements for retaining walls and a certifier can confirm whether a planned wall meets them; in a mine subsidence district, walls up to 1 m are on Subsidence Advisory NSW’s exempt list.
Will a sloping block take longer?
Usually, because access is tighter and fill goes in more carefully, but no published source gives reliable timeframes. Ask for a written schedule.
Sources
- SafeWork NSW: Excavations and earthmoving plant in construction (high risk excavation, SWMS, collapse controls, rollover), checked 15/11/2026
- NSW Planning: Demolition of buildings (compacted fill, CDC erosion conditions), checked 15/11/2026
- NSW Planning: Earthworks, retaining walls and structural supports, checked 15/11/2026
- Subsidence Advisory NSW: Exempt Developments List (PDF, April 2023), checked 15/11/2026
- Subsidence Advisory NSW: Mine Subsidence Districts, checked 15/11/2026
- Standards Australia: AS 3798-2007, checked 15/11/2026
- Bureau of Meteorology: Newcastle Nobbys Signal Station AWS (061055), checked 15/11/2026